Re-Build Plan’s Approved

Plans to changes to internal structure to Unit 8 have recently been approved.
Given the weather so far this year it has taken much longer to get to the warm dry to give the box a chance to heat up and dry out as much as possible before the timber and board start’s going up.
Timber is on the way now so the frame will start going up soon, well planned as to how to put it all together, can’t wait to start putting everything together and documenting.

Floor Fully Down

Space Heater gone and Floor Finished

Finally got the pvc/rubber floor tiles down and fitted, a little spring under foot but much better, easier to sweep that’s for sure.
Need to work out how to box this end, lot’s of bit’s I don’t want to see when it’s finished.

The second big, useless space heater has gone too, makes such a difference without those.

Working, Working on Workshop, Playing

Workshop has been closed for a while to give time to work out how to fix the damp and mould that comes from a big brick box with paint, two 1990’s heaters and little else.
Happy building the space into something to be honest, got a vision that can expand, could become a cool place.

Workshop Flooring Nov 2018
New insulation, carpet and PVC/Rubber tiles going down.

It’s a case of taking time and fitting in the things that pop up from time to time and moving around the stuff that has been accumulated over the last 3 years.

Workshop 1st Insulation Lining Nov 2018
Foil thermal/moisture barrier.

Foil up and Floor down before the Frame starts.